We are in the process of finishing out a Wesmac 50 hull to yacht standards with an expected launch date of Spring 2007. The boat arrived at our facility in the Spring of 2005 as a bare hull.

Completed items as of Spring 2006:

  • Added Nacelles to the Hull for the Jets
  • Installed Fuel Tanks and Systems
  • Installed Engines and Jets
  • Installed Following Systems: A/C, Water, Watermaker, Waste & Holding Tanks / Pumps, Washer / Dryer, Central Drainage, Espar, Thruster, Generator, Muffler, Bow Roller Assembly
  • Construct & Fair Cabin House
  • Construct Salon Sole
  • Construct Interior Partitions Below
  • Aft Cockpit Gridwork
  • Engine Insulation

Still to do:

  • Finish Cockpit / Lockers
  • Put on Winterback
  • Install Windows & Hatches
  • Build Cabin Interior, Cabinetry
  • Install Headliners
  • Install Galley
  • Basic Wiring and Plumbing
  • Install Electronics and Steering System
  • Awlgrip Top to Bottom
  • Finish Interior Woodwork

Feel free to stop by our facility on Route 90 in Rockland Maine to tour the Progress...

Please click on any picture below for a closer look:

Wesmac 50 Hull arriving at Johanson Boatworks Spring 2005 Backing Wesmac 50 into the Work Bay Forming a Mold for the Cabin House on the Wesmac 50
Melamine Installed and Form Ready for Laminating Cabin House Lamination Complete and Ready for Fairing Bolting Down the Engines on the Wesmac 50
Grid Work for Cockpit Sole Wesmac 50 A/C, Water, Plumbing, Misc. Systems in the Fuel Room Interior Partitions and Shower Sump in Wesmac 50
Interior modifications Fairing inside Final fair on helm station
Passenger seat Galley construction Forward end galley and passenger seat
Aft end of galley area Guest cabin bunktop Guest cabin
Queen forward berth Head cabinet construction Shower stall
Face frame for head cabinet Head vanity and cabinet Washer/dryer install
Air conditioning and watermaker Engine room insulation Paint out propane locker
Final fairing on cabin house Bowsprit layout Tape off for spray
Mask off for cabin side spray Prep for spray Prep for spray
Masking off for spray Fairing waterline Tape waterline
Finish coat topsides Stage topsides Hull awlgripped/prep deck
Teak rubrails Forming radius forward bunk Doors ready for finishing
Prefinished doors and cabinetry Finished forward bunk tops Prime air handlers
   
Fabricating pieces    